FTTH as-built documentation
Built route, hand holes, splices and pole line, with ordered layers and symbology consistent across sheets. This is what gets the build certified.
- DWG
- KMZ
- Shapefile
Telecom network documentation
Georeferenced as-built, survey and fibre route planimetry. Seven years documenting telecom networks in AutoCAD, QGIS and MicroStation.
Work
Six types of work. Each with its delivery formats.
Services
per route kilometre
Planimetry of the built network with passive and active elements located, ready to submit.
per kilometre or sheet
Field data, GPS tracks and paper drawings turned into georeferenced vector documentation.
fixed package per build
The complete package tenders ask for: planimetry, georeferenced photo records and test protocols.
per room or per floor
Equipment rooms, racks and low-voltage systems in building projects: data, CCTV and access control.
Standard
It isn't preference: it's what separates work that passes review from work that comes back.
Tools
Contact
Tell me where the build stands and what documentation is required. You get a turnaround and a number back.
Message to send
Hi Emiliano, I'm reaching out about build documentation.
Fill in what you know. We'll sort out the rest.